Diary of an express repair | Asbestos cement pipe repair. DN 1200 PN 10.
Asbestos cement pipe repair.
Tuesday
20:00
– Water company with more than 2.5M users.
– Failure of one of its main water adduction lines.
– Our client encountered a problem in one of its main water adduction lines. This line supplies water to more than 1.5 million people. It is an asbestos cement pipe ND 1200 mm NP 10 bar.
DHSF HERMETICA manufactures customised repair clamps to ensure the right performance in any type of situation. In addition, HERMETICA clamps, due to their low weight and easy installation, avoid further excavation as well as damage to surrounding services (electricity and other water distribution pipes).
Wednesday
07:00
– The engineering department designs a S40 clamp (380 mm wide) using 3D software.
07:30
– The production department approves the design and starts urgent production.
11.30
– The factory completes production of the customised clamp.
//
– In the meantime, our logistics department organises an express service to deliver the clamp 650 km away on the same day.
19.00
– The clamp is in the right place to be installed just in time.
Thursday morning
The water is running. The customer sends us the attached photos.
We are proud of our entire team. Thank you for making this success story possible. We have solved an urgent problem just in time, saving time, money and water for another happy customer.
Post en LinkedIn